Civil Works : Construction of Concrete Slab, Bund Wall, Access Ramp, Sump, Plinths, and Tank Base.
Mechanical Tanks - Fabrication, supply and Installation of Hydrated Lime Tanks and CMC Tanks.
Plate & Structural Works : Hydrated Lime wet Scrubber Discharge Chute, Hydrated time Bag breaker Hopper
Piping Works : Supply, fabrication and Installation of all pipes. Sand Blasting and Coating